equal2new® Certification Process
How do we ensure the second to none quality, flawless performance and 99.51 percent reliability rating of all equal2new products? Simply by putting each piece of equipment through a rigorous testing, reconditioning, and certification process that meets or exceeds factory specifications. From the moment it arrives to the moment it's packed for shipping, equipment is cleaned, reset, tested and re-tested. We'll even repaint it to get rid of those unsightly scratches on the case. Obsessive? Yes. But that's what it takes to be equal2new. We're so confident in our thorough 10-step process that we then back our equal2new gear with an industry-leading warranty.
Step 1: Physical Inspection
The process begins at check-in with a complete physical inspection of every piece of
hardware that arrives at the testing facility. Here, stringent electrostatic discharge
(ESD) prevention methods are followed to protect equipment from potentially damaging static
discharge. During inspection, any equipment that arrives in unacceptable condition is
immediately rejected. A product may be rejected at any step along the way if it is not
working properly, no matter how reputable the manufacturer. It has a long way to go to
earn its equal2new seal.
|
Step 2: Barcode Assignments
After a physical inspection, each piece is assigned a unique barcode. This advanced inventory
system will provide a tracking mechanism and comprehensive history of the product, not only
throughout the remainder of the certification process, but long after the equipment has been
integrated into its new environment. This code enables us to reacquaint ourselves in seconds
with any equal2new product, making it easier to for our experts to answer your questions or
offer help with troubleshooting.
|
Step 3: Internal Inspection
Once the equipment has been given a barcode, it is moved into our Testing Center. The first
thing our experienced testers do is look under the hood and verify if the unit is at manufacturers'
spec for DRAMM and FLASH. They also check to make sure no components have come loose.
|
Step 4: Diagnostic Testing
After the equipment passes internal inspection, our technicians continue the process by running
it through the first of a series of extensive diagnostic tests. Each product is analyzed to ensure
that it functions at the original manufacturer's specs. With more than 20 years of experience behind
them, our experts are among the best in the business.
|
Step 5: Live Network Testing
If diagnostic tests confirm that a product meets the manufacturer's requirements, our live
network testing confirms that a product will meet your requirements. In this step of the process,
the product is installed in our testing facility -- where it is really put through its paces.
|
Step 6: Reset Configurations
During this stage, all previous configurations are wiped clean and the product is reset to
original factory defaults. Rest assured - you'll never receive a product still configured with its
previous owner's confidential information or passwords.
|
Step 7: Reconditioning
You won't find missing parts on equal2new products. Lost screw connectors, power supplies or rack
mount hardware are replaced during this step of the process. On the way to earning equal2new certification,
every piece of equipment is thoroughly cleaned, polished, and detailed.
|
Step 8: Final Quality Verification
Products that receive any modifications undergo a second set of diagnostic tests to make sure
they're working properly and that they still hold up to manufacturer's specifications. Nothing is left
to chance with equal2new.
|
Step 9: equal2new Certification
In the final quality control inspection, an expert evaluator reviews all the stages of the process.
Just as all the other testers and inspectors have done before him (or her!), he (or she) electronically
updates the barcode tracking information unique to that product. Finally, after passing more tests than
the original manufacturer ever put it through, the hardware earns equal2new certification. The equal2new
seal is your guarantee of reliable performance.
|
Step 10: Foam-in-Place Packing
Shipping can be tough on networking equipment. That's why we ship equal2new certified hardware carefully.
Our Foam-in-Place packaging technology keeps equipment securely in place with a custom cushion. All of
our equal2new products arrive at your company in perfect condition.
|
|
|
|
|